PHS Engineering Challenge

In 2021/22 PHS academic day, the students competing in the engineering challenge were tasked with building a ball-run structure using only paper and tape within 2 hours. The objective was to keep the ping pong ball off the ground for as long as possible by designing structures with a series of tubes, gutters, obstacles and friction-inducing elements to slow the ball down as much as possible.

Check out the summary of the competition at YouTube